Mesaieed IPP of 2000 MW/400 kV

Employer

Mpc Ltd,
KAHRAMAA (Qatar General Electricity & Water Corporation)

Scope of Work

EPC of civil works for the construction of 400, 220 and 132 kV GIS buildings including all associated MEP works and equipment installation:

  • Mechanical: Plumbing, HVAC, and fire fighting
  • Electrical: Internal/external lighting, small power, distribution boards, telephone network system, intrusion alarm, fire detection and alarm, earthing, and lightning
  • Architectural and finishing works for the construction of all 400/220/132/11 kV GIS buildings
  • Infrastructure, site works and landscaping

Project Description

  • 400 kV GIS building:
    • Floor area 2×3,000 m2; 14.5 m precast beams length; 12.6 m floor clear head
    • The HVAC system consists of 4 packaged units (2 standby), capacity 388 kW (115 TR) each, and fire rated smoke exhaust system 4×14828 l/s and 2×9 886 l/s
  • 400 kV control building:
    • Floor area 410 m2; 4.4 m floor clear head
    • The HVAC system consists of 2 packaged units (1 standby), capacity 109 KW (32 TR) each
  • 220 kV GIS building:
    • Floor area 2×1400 m2; 8.5 m floor clear head
    • The HVAC system consists of 2 packaged units (1 standby) capacity 310 KW (91 TR) each, and fire rated smoke exhaust system 2×11 735 l/s and 2×5 869 l/s
  • 132 kV GIS building:
    • Floor area 2×650 m2; 8.5 m floor clear head
    • The HVAC system consists of 2 packaged units (1 standby), capacity 164 KW (48 TR) each
  • 132 kV control building:
    • Floor area 510 m2; 5.7 m floor clear head
    • The HVAC system consists of 2 package units (1 standby) capacity 192 KW (56 TR) each, and fire rated smoke exhaust system 1 x 9 452 l/s and 1 x 5 108 l/s