Arzew GNL 3Z Project

Employer
SONATRACH
Scope of Work
Construction of the following structures:
- Discharge holding basin
- Separation tanks and annexed trenches
- Liquefying tank and annexed trenches
- Safety/security building
- Administrative building
SONATRACH
Construction of the following structures:
Scope of Work BUTEC was tasked to design and build extension and enhancement works at the Shah Gas Sulphur recovery live plant to increase the safety and efficiency of the plant’s critical operations. Project Description Chemical Unloading: The objective is to safely and securely discharge Biocide and Surfactant from an ISO container (24,000L) delivered upon…
Scope of Work To upgrade the existing Storm Water Drainage and Firewater Distribution systems. The purpose of the facility is to restore and upgrade the firefighting capability and industrial drainage systems to meet safety requirements. BUTEC is responsible of material procurement, construction management, quality management, and testing and commissioning of all works related to the…
Scope of Work EPC contract for the construction of 10 storage steel tanks, 33,000 m3 each 8 tanks with floating roof for heavy crude oil, light crude oil, naphta and gasoil 2 tanks with fixed roof for fuel oil Project Description Steel plates conformant to ASTM and API specifications Distribution pipe network – according to…
Scope of Work EPC contract for the construction of 25 steel tanks for the storage of chemical products with diameters up to 21.4 m and heights up to 25.5 m Project Description Full and detailed tank design according to API 650 addendum 4 and Qatar Gas special requirements Design, fabrication, and installation of internal and…
Project Description One storage tank (floating roof, double deck) for condensate Internal diameter: 57 m, Height: 17m, Nominal volume 35,000m3 1,000 tons of steel plates conformant to ASTM and API 650 Welding procedures according to ASME and American Welding Society norms & code Non destructive testing according to API 650 and ASME codes Provisions for…
Scope of Work The project consisted mainly of rebuilding facilities destroyed during the war of July 2006 including 3 fuel storage steel tanks with a concrete skin for protection and a supported cone roof. The capacity of each tank is 6 000 m3 2 restored as follows: Bottom 10% Shell 40% Roof structure 100% Roof…
Scope of Work EPC of the following: Civil works for 4 substations, 33/11 kV, 40 MVA each 120 km of underground 11 kV cables for ring main units 110 km of underground 33 kV cables and connection to power grid 20 km of underground fiber optic cables Earthing grid for substations Installation of the following:…
Scope of Work EPC in addition to testing and commissioning for all civil works, as well as associated MEP works and equipment installation. It covers 12 buildings of package “B” related to the units Shah Process Plant (EPC package 2) & Shah Sulfur Recovery Units (EPC package 3), located at Shah, U.A.E. in the frame…